3000t/d tin ore dressing plant main equipment list

3000t / d major tin beneficiation plant equipment list

project

Name and specification

Number of units

Maximum throughput

First, broken mine

Tons/tables·hours

Product granularity (milligrams)

Layout width (mm)

Ore loose density (ton / meter 3 )

Coarse

900×1200 jaw crusher

1

225

0~224

140

2.12

Broken

Φ1650 standard cone

1

320

0~80

40

2.12

Finely broken

Φ2200 short head cone

1

344

0~24

11

2.12

Second, grinding, grading

Φ2800×3600 wet lattice ball mill

3

51.58

Feeding particle size 0~15 mm

Grinding fineness - 200 mesh accounted for 60%

Third, flotation

m 3 / ton day

Working concentration

Feeding granularity

Flotation

(fine, rough, sweep) XJK-2.8

12

0.122

30 to 18%

-200 mesh point 60%

JJF-4

84

0.122

30 to 18%

"

Fourth, dehydration

t/m 2

Feed concentration (%)

Mine concentration filter cake moisture (%)

Concentrate density (ton / meter 3 )

concentrated

Shrink

machine

Φ18 m peripheral drive

1

0.585

6-8

55

6.6

Φ18 m peripheral drive

2

0.495

8-10

50

4.0

Φ30 m peripheral drive

1

1.14

6-8

55

4.7

Over

filter

machine

40 m 2 fold filter (Pb)

1

0.17

55

<12

40 m 2 fold filter (Zn)

2

0.1275

50

<15

40m 2 fold with filter (S)

2

0.340

55

<10

dry

dry

machine

Φ1500×12000(Pb)

1

35 kg water / m 3 o'clock

12%

<8%

Φ2400×12000(Zn)

1

35 kg water / m 3 o'clock

15%

<8%

Note: The above equipment selection is for reference only. The specific equipment specifications and quantity need to be subjected to detailed mineral processing experiments, which can be determined according to the nature of the ore.